4-2-5: APPLICATION:
   A.   Time Of Filing: Application for a license to hold an actual or anticipated assembly of five hundred (500) or more persons shall be made, in writing, to the county commission at least thirty (30) days in advance of such assembly.
   B.   Affirmation; Required Signatures: The application shall contain a statement made upon oath or affirmation that the statements contained therein are true and correct to the best knowledge of the applicant and shall be signed and sworn to or affirmed by the individual making application in the case of an individual natural human being, by all officers in the case of a corporation, by all partners in the case of a partnership or by all officers, by all members of such association, society, or group or, if there be no officers, by all members of such association, society or group.
   C.   Required Information: The application shall contain and disclose:
      1.   The name and mailing address of all persons required to sign the application, and, in the case of a corporation, a certified copy of the articles of incorporation together with the name, and mailing address of each person holding ten percent (10%) or more of the stock of said corporation.
      2.   The address and general description of all property upon which the assembly is to be held, together with the name, residence and mailing address of the record owner(s) of all such property.
      3.   Proof of ownership of all property upon which the assembly is to be held or a statement made upon oath or affirmation by record owner(s) of such property that the applicant has permission to use such property for an assembly of five hundred (500) persons or more.
      4.   The nature or purpose of the assembly.
      5.   The total number of days and/or hours during which the assembly is to last.
      6.   The maximum number of persons which the applicant shall permit to assemble at any time, not to exceed the maximum number which can reasonably assemble at the location of the assembly in consideration of the nature of the assembly, or the maximum number of persons allowed to sleep within the boundaries of the location of the assembly by the zoning ordinances of the county if the assembly is to continue overnight.
      7.   The maximum number of tickets to be sold, if any.
      8.   The plans of the applicant to limit the maximum number of persons permitted to assemble.
      9.   The plans for supplying potable water, including the source, amount available, and location of outlets.
      10.   The plans for providing toilet and lavatory facilities including the source, number and location, type, and the means of disposing of solid waste deposited.
      11.   The plans for holding, collection, and disposing of solid waste material.
      12.   The plans to provide for medical facilities including the location and construction of a medical structure, the names and addresses and hours of availability of physicians and nurses, and provisions for emergency ambulance service.
      13.   The plans, if any, to illuminate the location of the assembly.
      14.   The plans for parking vehicles.
      15.   The plans for camping facilities, if any, including facilities available and their location.
      16.   The plans for security.
      17.   The plans for fire protection.
   D.   Bond; License Fee: The application shall include the bond required and the license fee. (Ord. 86-3, 8-11-1986)