§ 13-10-5-2 PERMITS.
   (A)   Public ways.
      (1)   (a)   A public way permit must be obtained from the Town Public Works Department prior to any construction or excavation within any public or private right-of-way, easement or bike path, except when emergency circumstances demand the work be done immediately and the permit cannot reasonably and practically be obtained beforehand.
         (b)   In such a case the person digging must apply for a permit on the first regular business day, on which the town offices are open for business.
      (2)   Public way permits shall be required for, but not limited to, sidewalk construction, reconstruction, sewer and water line construction and repair, curb cuts, underground utility line construction or repair, curb, gutter, street or alley construction or reconstruction, and service line work within a right- of-way, easement or bike path.
   (B)   New subdivisions. Before any excavation work can be started on streets or utilities in any new or proposed subdivision, a public way permit shall be obtained.
   (C)   Permit conformance. Permittees shall conform to all requirements of the design standards and street cut ordinance, as well as any specifications that may be required for special cases.
   (D)   Streets. Street resurfacing on street cuts shall be done in accordance to methods stated on the permit as issued and as specified in Title 8, Chapter 1 of this code.
(Ord. 2(1983) § 1)