§ 12-12-2 APPLICABILITY.
   An environmental impact report shall be submitted to the Administrator for any project for which such a report is required by federal or state law, or for any project which the Administrator determines may significantly change the environment, either during construction or on a continuing basis, in one or more of the following respects:
   (A)   Alters an ecological unit or land form, such as a ridgeline, saddle, draw, ravine, hillside, cliff, slope, creek, marsh, watercourse or other natural landform feature;
   (B)   Directly or indirectly affects a wildlife habitat, feeding or nesting ground;
   (C)   Alters or removes native grasses, trees, shrubs or other vegetative cover;
   (D)   Affects the appearance or character of a significant scenic area or resource, or involves buildings or other structures that are of a size, bulk or scale that would be in marked contrast to natural or existing urban features;
   (E)   Potentially results in avalanche, landslide, siltation, settlement, flood or other land form change or hazard to health and safety;
   (F)   Discharges toxic or thermally abnormal substances, or involves use of herbicides or pesticides, or emits smoke, gas, steam, dust or other particulate matter;
   (G)   Involves any process which results in odor that may be objectionable or damaging;
   (H)   Requires any waste treatment, cooling or settlement pond, or requires transportation of solid or liquid wastes to a treatment or disposal site;
   (I)   Discharges significant volumes of solid or liquid wastes;
   (J)   Has the potential to strain the capacity of existing or planned sewage disposal, storm drainage, or other utility systems;
   (K)   Involves any process which generates noise that may be offensive or damaging;
   (L)   Either displaces significant numbers of people or results in a significant increase in population;
   (M)   Preempts a site with potential recreational or open space value;
   (N)   Alters local traffic patterns or causes a significant increase in traffic volume or transit service needs; and
   (O)   Is a part of a larger project which, at any future stage, may involve any of the impacts listed in this section.
(Ord. 8(1973) § 16.200; Ord. 29(2005) § 31)