All
and
applications containing at least 50
or at least five acres, whichever is the lesser, in
hazard areas where
data are not available, shall be supported by hydrologic and hydraulic engineering analyses that determine
and
information. The analyses shall be prepared by a licensed professional engineer in a format required by FEMA for a Conditional Letter of Map Revisions or Letter of Map Revision.