§ 240-2.   Permit required.
[Amended 9-14-2004 by Ord. No. 1140]
It shall be unlawful for the owner of any land to stop, fill up, confine, pave or otherwise interfere with or change the course of any drain, ditch, stream, swale, stormwater management facility or watercourse in Upper Dublin Township without first obtaining from the Township Engineer a permit authorizing such work to be performed; and no drain, ditch, stream, swale, stormwater management facility or watercourse shall be stopped, filled up, confined, paved or otherwise interfered with or the course thereof changed except in strict accordance with the terms and conditions of such permit and the plans and specifications submitted therewith.