(a) The Building Commissioner shall require permit fees for commercial plumbing installations in accordance with the following schedule. Permit fees for new construction, additions and/or alterations shall include a square footage fee determined by multiplying the square footage of the project by ten percent (10%). All permit fees hereunder shall include an additional Ohio Board of Building Standards fee determined by multiplying the aggregate commercial plumbing permit fees by an additional three percent (3%).
COMMERCIAL PLUMBING PERMITS | BASE FEE | SQUARE FOOT FEE |
COMMERCIAL PLUMBING PERMITS | BASE FEE | SQUARE FOOT FEE |
NEW CONSTRUCTION | 250.00 X .10 = | |
ADDITIONS | 175.00 X .10 = | |
ALTERATIONS | 125.00 X .10 = | |
EACH FIXTURE | 25.00 X = | |
EACH HOT WATER HEATER | 50.00 X = | |
WATER SERVICE, SANITARY AND STORM CONNECTIONS, LATERALS (INCLUDED REPAIRS) | 125.00 X = | |
GAS LINES | 75.00 | |
SUB-TOTAL | ||
3% BBS FEE | ||
TOTAL | ||
(b) The Building Commissioner shall require permit fees for residential plumbing installations in accordance with the following schedule. Permit fees for new construction, additions and/or alterations shall include a square foot fee determined by multiplying the square footage of the project by six percent (6%). All permit fees hereunder shall include an additional Ohio Board of Building Standards Fee determined by multiplying the aggregate residential plumbing permit fees by an additional one percent (1%).
RESIDENTIAL PLUMBING PERMITS | BASE FEE | SQUARE FOOT FEE |
RESIDENTIAL PLUMBING PERMITS | BASE FEE | SQUARE FOOT FEE |
NEW CONSTRUCTION | 150.00 X .06 = | |
ADDITIONS | 100.00 X .06 = | |
ALTERATIONS | 100.00 X .06 = | |
EACH FIXTURE | 25.00 X = | |
EACH HOT WATER HEATER | 75.00 X = | |
WATER SERVICE, SANITARY AND STORM CONNECTIONS, LATERALS (INCLUDED REPAIRS) | 100.00 X = | |
GAS LINE | 50.00 | |
SUB-TOTAL | ||
1% BBS FEE | ||
TOTAL | ||
(Ord. 2024-02. Passed 1-16-2024.)