(a) The Building Commissioner shall require permit fees for commercial heating, ventilation and air conditioning units (HVAC) in accordance with the following schedule. Permit fees for new construction, additions and/or alterations shall include a square footage fee determined by multiplying the square footage of the project by ten percent (10%). All permit fees hereunder shall include an additional Ohio Board of Building Standards Fee determined by multiplying the aggregate commercial HVAC permit fees by an additional three percent (3%).
CONSTRUCTION HVAC PERMITS | BASE FEE | SQUARE FOOT FEE |
CONSTRUCTION HVAC PERMITS | BASE FEE | SQUARE FOOT FEE |
NEW CONSTRUCTION | 250.00 X .10 = | |
ADDITIONS | 175.00 X .10 = | |
ALTERATIONS | 125.00 X .10 = | |
EACH HEATING UNIT OR AC UNIT | 125.00 X = | |
EACH CONVERSION OR REPLACEMENT | 125.00 X = | |
SOLAR OR GEOTHERMAL | 250.00 | |
SUB-TOTAL | ||
3% BBS FEE | ||
TOTAL | ||
(b) The Building Commissioner shall require permit fees for residential heating, ventilation and air conditioning units (HVAC) in accordance with the following schedule. Permit fees for new construction, additions and/or alterations shall include a square foot fee determined by multiplying the square footage of the project by six percent (6%). All permit fees hereunder shall include an additional Ohio Board of Building Standards Fee determined by multiplying the aggregate residential HVAC permit fees by an additional one percent (l%).
RESIDENTIAL HVAC PERMITS | BASE FEE | SQUARE FOOT FEE |
RESIDENTIAL HVAC PERMITS | BASE FEE | SQUARE FOOT FEE |
NEW CONSTRUCTION | 150.00 X .06 = | |
ADDITIONS | 100.00 X .06 = | |
ALTERATIONS | 100.00 X .06 = | |
EACH HEATING UNIT OR AC UNIT | 100.00 X = | |
SOLAR OR GEOTHERMAL | 150.00 | |
SUB-TOTAL | ||
1% BBS FEE | ||
TOTAL | ||
(Ord. 2024-02. Passed 1-16-2024.)