(A) Installation notice. Upon the completion of the work which has been authorized by issuance of any permit, it shall be the duty of the person, firm, or corporation installing the same to notify the Clerk; said Clerk shall relay the request for inspection to the Inspector, and the inspection shall be completed within 24 hours, exclusive of Saturdays, Sundays, and holidays, of the time such notice is given, or as soon thereafter as Is practicable.
(2005 Code, § 240.005)
(B) Installations to conform to standard safe practice.
(1) Installation of gas piping and appliances for domestic and commercial uses, in accordance with the standards of the National Board of Fire Underwriters for the installation of gas piping and gas appliances in buildings (Pamphlet No. 54) shall be deemed prima facie evidence of installation in accordance with standard safe practice.
(2) Installation of gas equipment in large boilers and water heaters having an input of over 400,000 BTU per hour, in accordance with American Standard Requirements for Installation of Gas Equipment in large boilers (ASAZ21.33), shall be deemed prima facie evidence of installation in accordance with standard safe practice.
(2005 Code, § 240.008) (Ord. 5-60, passed 12-19-1960)