1109.03 FILING AND APPROVAL OF FINAL PLAT; FEE.
   (a)   An application for approval of the final plat shall be submitted to the Planning Commission no later than fourteen days prior to the Planning Commission’s next meeting, on administrative forms provided by the Municipality, together with six copies of the final plat map and six copies of construction drawings including cover sheet, grading and drainage plans and street and utility improvement plans, and two copies of performance bond cost estimates. The final plat shall be prepared and certified by a registered surveyor; the construction drawings shall be prepared and certified by a registered engineer.
 
   (b)   Prior to initiating construction of the required public improvements, the subdivider shall enter into a Subdivider’s Agreement with Council. Prior to recording the approved final plat in the County Recorder’s Office, the subdivider shall post a performance bond. The administrative procedure for posting this performance bond is specified in Section 1121.03(b).
 
   (c)   The Planning Commission shall review the final plat for conformance with the preliminary plat and all other requirements specified in these regulations. The City Manager shall review the final plat and construction drawings for conformance of the proposed water and sanitary sewer facilities with its regulations and Union “Standard Specifications and Construction Drawings for Public Improvements.” The City Manager shall review the final plat and construction drawings for conformance of the proposed streets, curb and gutter, sidewalks and storm sewer facilities with Union’s “Standard Specifications and Construction Drawings for Public Improvements.” The Ohio Environmental Protection Agency shall review the proposed water and sanitary sewer facilities for conformance with its regulations.
(Ord. 333. Passed 12-10-73.)
 
   (d)   The applicant shall be charge two percent (2%) of the Letter of Credit or Performance Bond Estimate for public improvements for the final plat review.
 
   (e)   The applicant shall be charged for outside engineering and other professional services to review the final plat at the cost billed to the City.
(Ord. 1091. Passed 5-12-97.)