967.04.2 APPLICATION REQUIREMENTS.
   This section specifies the necessary requirements for a complete permit application. A complete application shall consist of the following:
   (a)   Application Fee - The applicant must provide the applicable permit application fee in the amount currently required by City of Union and listed in its permit fee schedule.
   (b)   RF Compliance Affidavit - Applicants must submit a sworn affidavit prepared and signed by an RF engineer with knowledge about the proposed project that affirms the proposed project will be compliant with all applicable governmental regulations in connection with human exposure to radiofrequency emissions. The affidavit must include:
      (1)   All frequencies on which the equipment will operate;
      (2)   How many channels will be used on each frequency;
      (3)   The effective radiated power ("ERP")
      (4)   Output level in measured watts; and
      (5)   The height above ground for the lowest point on the lowest transmitter.
      (6)   The required disclosures above must be included for all transmitters on the support structure, which includes without limitation existing collocated antennas and antennas used for wireless backhaul (such as microwave dish antenna or U/E relay).
   (c)   Regulatory Authorization - To the extent that the applicant claims any regulatory authorization or other right to use the public right of way, the applicant must provide a true and correct copy of the certificate, license, notice to proceed or other regulatory authorization that supports the applicant's claim.
   (d)   Owner's Authorization - Applicants must submit evidence sufficient to show that either:
      (1)   The applicant owns the proposed support structure or
      (2)   The applicant has obtained the owner's authorization to file the application.
   (e)   Site Plans and Structural Calculations. The applicant must submit fully dimensioned site plans, elevation drawings and structural calculations prepared, sealed, stamped and signed by a Professional Engineer licensed and registered by the State of Ohio. Drawings must depict any    existing wireless facilities with all existing wireless communications equipment and other improvements, the proposed facility with all proposed wireless communications equipment and other improvements and the legal boundaries of the leased or owned area surrounding the proposed facility and any associated access or utility easements.
   (f)   Equipment and Enclosure Specifications. The applicant shall provide dimensioned elevations, cut sheets, material samples or other construction documents necessary to evaluate for compliance with this Chapter.
   (g)   Statement of Intent. The applicant shall provide a statement of a wireless support structure's intended purpose.
(Ord. 1678. Passed 5-14-18.)