8-2-4: APPROVAL OF PERMITS:
Permits for any work involving the removal or destruction of any street surfacing, curb, curb and gutter, sidewalks, signs or other structure with public right of way shall be approved by the City Engineer.
A permit for performing work in or upon any public right of way shall not relieve the permittee of responsibility for the safety of water lines, sewer lines, electrical cables, conduit or any other structures, material or equipment which may be either above or below the ground, nor shall any such permit allow the permittee to enter upon any private property.
Permits shall not be granted for any improvement, excavation, fill, construction, repairs or any other work within the public right of way unless the contemplated work includes the construction of curb on all streets adjoining the property where adequate curbing does not exist at the time of application nor shall any permit be granted for any work within the streets adjoining any business property unless the contemplated work includes the construction of curb and sidewalk on all streets adjoining the property where adequate curbing and sidewalks do not exist at the time of application, except that in the Manufacturing Zones, as defined in this Code 1 , this requirement may be waived on approval of the City Council.
Permits shall not be granted for any work within or upon any public right of way bordering on any property having motor vehicle fuel pumps, driveway approaches, signs, sidewalks, curbs or other structures which do not conform to the existing requirements unless such items are to be reconstructed, removed or altered to conform to the existing requirements and regulations.
Permits shall not be granted for the use of any material other than Portland cement concrete for any new construction bordering on any business property within the space between the property line and the curb line of any street. (Ord. O-2022-009, 2-28-2022)

 

Notes

1
1. See Title 10 of this code.