7-7-6-2: MONITORING FACILITIES (EPA 6.2):
The city may require an industrial user, at the user's expense, to install a monitoring station, facilities and/or equipment as necessary to allow inspection, sampling, and flow measurements of each sewer discharge to the city and to ensure compliance with this chapter. All monitoring facilities shall be constructed and maintained in accordance with all applicable city construction standards and specifications. All devices used to measure wastewater flow and quality shall be calibrated at a frequency that will ensure their continuous accuracy.
There shall be ample room in or near sampling facilities to allow accurate sampling and preparation of samples for analysis. Sampling facilities, including sampling and measuring equipment, shall be maintained at all times in a safe and proper operating condition at the user's expense. (Ord. 2020-018, 10-19-2020)