7-7-4-5: NOTIFICATION OF SIGNIFICANT PRODUCTION CHANGES (EPA 4.5):
Any user operating under an industrial wastewater discharge permit incorporating equivalent mass or concentration limits shall notify the city within two (2) business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not providing a notice of such anticipated change will be required to comply with the existing limits contained in its industrial wastewater discharge permit. (Ord. 2020-018, 10-19-2020)