§ 51.27 MANHOLE INSTALLATIONS.
   When required by the Superintendent, the owner of any property serviced by a building sewer carrying industrial wastes shall install a suitable control manhole together with such necessary meters and other appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastes. This manhole shall be accessibly and safely located and shall be constructed in accordance with plans approved by the Superintendent. The manhole shall be installed by the owner at his expense, and shall be maintained by him so as to be safe and accessible at all times. The owner shall install such control manhole within 90 days of the Superintendent’s written request.
(Ord. 75-0-2, passed 4-28-75) Penalty, see § 51.99