(a) General. The fee for all building permits shall be as established by resolution of the Village Board. If work commences prior to obtaining a building permit, double fees will be charged.
(b) Permit fees.
(1) Building permit fees. The following fees apply to totally new construction, including additions, decks, and the like. All fractions are charged at the full incremental rate.
Total Valuation | Fee* |
Total Valuation | Fee* |
Up to $2,000 | $15 plus $1.67 per $100 over $500 |
$2,001 to $25,000 | $40 plus $7.60 per $1,000 over $2,000 |
$25,001 to $50,000 | $215 plus $4.20 per $1,000 over $25,000 |
$50,001 to $100,000 | $320 plus $3.20 per $1,000 over $50,000 |
$100,001 to $500,000 | $480 plus $2.42 per $1,000 over $100,000 |
$500,001 to $1,000,000 | $1,450 plus $2.15 per $1,000 over $500,000 |
Over $1,000,000 | $2,525 plus $1.38 per $1,000 over $1,000,000 |
Notes to Table: * Subject to minimums in this column | |
(2) Projects other than new construction. The following fees applies to projects other than new construction, such as remodeling.
a. Administrative fees. An administrative fee of 20% shall be added to the building for each combination of building, HVAC, plumbing, or electrical permit issued for the project. The fee shall not exceed $50.
b. Other inspection fees.
Type of Inspection | Fee |
Type of Inspection | Fee |
Additional plan review from changes, additions | $32 per hour |
Erosion control permit | $25 per site |
Inspections outside normal business hours | $32 per hour |
Inspections with no specific category | $32 per hour |
Plan review | 15% of plan fee |
Reinspections | $32 per hour |
State building permit seal, when required | $25 |
c. Minimum fees. The value of construction for calculating permit fees shall be calculated using the most recent building valuation data (including regional modifiers, as published by the International Conference of Building Officials in Building Standards magazine).
Structure
|
Fee
|
Fences | $25 |
Signs | $25 |
d. Separate permit fees.
Type of Work to be Done
|
Fee
|
Electrical Circuit openings New circuits Service feeder panels | $0.30 $3 $30 |
Heating, ventilating, air conditioning Commercial over $50,000 value Commercial to $50,000 value Residential equipment | $500, plus 0.75% of value over $500 1% of total work $30 per unit |
Plumbing Equipment installation Lateral inspection | $8 per fixture $30 |
Remodeling requiring permit | $0.05 per sq. ft. of affected area* |
Notes to Table: *Electrical, HVAC, and plumbing additional |
e. Penalty. A penalty fee shall be assessed for any work started without a building permit. The penalty fee shall be equal to the permit fee. The village shall retain all penalty fees; the Clerk shall attribute the same to the General Fund.
(Prior Code, § 15-1-14) (Res. 2001-5, passed 3-19-2001)