Village of Turtle Lake Environmental Assessment Checklist for Subdivisions and Land Divisions by Certified Survey
|
Village of Turtle Lake Environmental Assessment Checklist for Subdivisions and Land Divisions by Certified Survey
| ||
All “yes” answers must be explained in detail by attaching maps and supportive documentation describing the impacts of the proposed development. | ||
Land Resources | Yes | No |
Does the project site involve: | ||
A. Changes in relief and drainage patterns (attach a topographic map showing, at a minimum, two (2) foot contour intervals). | ____ | ____ |
B. A floodplain. (If yes, attach two (2) copies of a typical stream valley cross-section showing the channel of the stream, the 100-year floodplains limits and the floodway limits (if officially adopted), of each site of the channel and a crosssection of area to be developed.) | ____ | ____ |
C. An area of soil instability - greater than 20% slope and/or organic soils, peats, or mucks at or near the surface. | ____ | ____ |
D. Prime agricultural land (Class I, II, or III soils). | ____ | ____ |
E. Wetlands and mapped environmental corridors. | ____ | ____ |
Water Resources | ||
Does the proposed project involve: | ||
A. Location within the area traversed by a navigable stream or dry run. | ____ | ____ |
B. Lake frontage. | ____ | ____ |
Human and Scientific Interest | ||
Does the project site involve: | ||
A. An area of archeological or geological interest. | ____ | ____ |
B. An area of historical interest. | ____ | ____ |
C. An area of buildings or monuments with unique architecture. | ____ | ____ |
Energy, Transportation and Communications | ||
A. Does the development encompass any future street appearing on the Village of Turtle Lake Official Map? | ____ | ____ |
B. Is the development traversed by an existing or planned utility corridor (gas, electricity, water, sewer interceptor, communications, storm sewer)? | ____ | ____ |
(Prior Code, Title 14, Chapter 1, Appendix A)