§ 8.24.350 Survey and monuments.
   (A)   Survey required.
      (1)   Final subdivision maps and parcel maps shall be based upon a complete and accurate survey of the land to be subdivided prepared by a California- registered civil engineer or land surveyor.
      (2)   All found monuments, property lines, centerlines of streets, alleys, and easements adjoining or within the subdivision shall be tied into the survey.
   (B)   Monuments required.
      (1)   At the time of making the survey for a final subdivision map or parcel map, the engineer or surveyor shall set sufficient, durable monuments which conform with Cal. Business and Professions Code § 8771 so that another engineer or surveyor may readily retrace the survey.
      (2)   Prior to recording final subdivision maps and parcel maps, at least one exterior boundary line shall be identified by a monument.
      (3)   Additional monuments shall be set as required by the City Engineer.
      (4)   Interior monuments need not be set at the time the map is recorded, if both the following are true:
         (a)   The engineer or surveyor certifies on the map that the monuments will be set on or before a specified later date.
         (b)   The applicant furnishes to the City Engineer security guaranteeing the payment of the cost of setting such monuments.
(Ord. 15-12, passed 12-15-2015)