(A) The General Manager may modify the wastewater discharge permit for good cause including, but not limited to, the following:
(1) To incorporate any new or revised federal, state or local pretreatment standards or requirements;
(2) To address significant alterations or additions to the industrial user’s operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance;
(3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
(4) Information indicating that the permitted discharge poses a threat to the POTW, city personnel or the receiving waters;
(5) Violation of any terms or conditions of the wastewater discharge permit;
(6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;
(7) Revision of, or a grant of, variance from categorical pretreatment standards pursuant to 40 C.F.R. § 403.13; and
(8) To correct typographical or other errors in the wastewater discharge permit.
(B) The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition.
(1995 Code, § 7.20.660) (Ord. 17-03, passed 3-21-2017; Ord. 15-02, passed 5-5-2015)