§ 7.20.610 Additional pretreatment measures.
   (A)   Whenever deemed necessary, the General Manager may require industrial users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate domestic waste streams from industrial waste streams and such other conditions as may be necessary to protect the POTW and determine the industrial user’s compliance with the requirements of this chapter.
   (B)   The General Manager may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization.
   (C)   Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter.
(1995 Code, § 7.20.520) (Ord. 17-03, passed 3-21-2017; Ord. 15-02, passed 5-5-2015)