Each length of cast or ductile iron soil pipe and each cast or ductile iron fitting used in a sewerage system shall be stamped or indelibly marked with weight or grade thereof and the marker’s mark or name.
(1995 Code, § 7.20.270) (Ord. 17-03, passed 3-21-2017; Ord. 15-02, passed 5-5-2015)