(a) No person shall tap into or connect a pipe with any water line or main belonging to the City unless the tap or connection is made in accordance with the rules of the City.
(b) No tap to the water service shall be made without at least twenty-four hours' notice to the City or its authorized agents, prior to the date on which the tap is to be made. The permit and entrance fee for water permits shall cover the costs of all inspections by authorized personnel of the City. The cost of entrance installation and furnishing of meters is set by contract with the City of Dayton, and governed by the rules and regulations of the City of Dayton Water Department, effective July 1, 1959, and as amended. These rules and regulations are incorporated herein by reference as fully as if herein specifically set forth. A copy of the rules and regulations are on file with the City. The permit and entrance fee for sewer service shall cover the cost of all inspection by authorized personnel of the City. Saddle and sealing material, in addition to all other material required, shall be furnished by the contractor.
(1987 Code 50.29)