The following tables compromise the schedule of fees for land use in the village (current as the last revisions dated December 2, 2019), which shall be subject to change by resolution of the Village Board.
Building and zoning codes | Fee |
Building and zoning codes | Fee | |
Existing building permits | ||
Addition to non-residential structure (total building area under roof above grade) | $1.50 per square foot, $500 minimum | |
Addition to residential structure 400 square feet and less | $100 | |
Addition to residential structure more than 400 square feet | $200 | |
Change of occupancy | $100 | |
Historic buildings | $300 | |
Level 2 alteration | $100 | |
Level 3 alteration | $200 | |
Relocated or moved buildings | $300 | |
Other miscellaneous permits | ||
Accessory structure (greater than 80 square feet) | $50 | |
Decks (greater than 80 square feet) | $40 | |
Driveway (if not part of a structure permit) | $50 | |
Fences (taller than 2 feet) | $40 | |
Signs (attached sign and free-standing sign) | $50 | |
Solar energy permit | $40 | |
Structure demolition | $50 | |
Swimming pool permit (pools deeper than 2 feet) | $40 | |
Non-residential structure permits | ||
New construction (total building area under roof above grade) | $3 per square foot, $1,000 minimum | |
Residential structure permits | ||
Multiple-family (three-unit fee) | $500 | |
Multiple-family per unit above three | $100 | |
Single-family | $300 | |
Two-family | $400 | |
Violations | ||
First violation per day past designated date | $70 | |
Second violation per day past designated date | $150 | |
Maximum fine per day past designated date | $750 | |
Land Use Board actions | Fee |
Home occupation special use permit | $40 |
Property zoning changes | $250 |
Special Board meeting | $550 |
Special use permits | $250 |
Zoning code variances | $250 |
Subdivision Regulations | ||||
Number of Lots | Base Fee | Additional Fee/Lot | Fee Range |
Subdivision Regulations | ||||
Number of Lots | Base Fee | Additional Fee/Lot | Fee Range | |
Condominium review fees | $20 per unit | |||
Construction plan review fees | Less than 5 | $700 | $0 | $700 |
6 to 10 | $700 | $50 | $750 to $950 | |
11 to 20 | $950 | $40 | $990 to $1,350 | |
21 to 40 | $1,350 | $30 | $1,380 to $1,950 | |
41 to 60 | $1,950 | $25 | $1,975 o $2,450 | |
61 to 100 | $2,450 | $20 | $2,470 to $3,250 | |
More than 100 | $3,250 | $10 | $3,260 minimum | |
Final plat fee | Less than 5 | $150 | $0 | $150 |
6 to 10 | $150 | $30 | $180 to $300 | |
11 to 20 | $400 | $20 | $320 to $500 | |
21 to 40 | $700 | $15 | $515 to $800 | |
41 to 60 | $1,100 | $10 | $810 to $1,000 | |
61 to 100 | $1,400 | $8 | $1,008 to $1,320 | |
More than 100 | $1,800 | $5 | $1,325 minimum | |
Preliminary plat fee | Less than 5 | $150 | $0 | $150 |
6 to 10 | $150 | $30 | $180 to $300 | |
11 to 20 | $400 | $20 | $320 to $500 | |
21 to 40 | $700 | $15 | $515 to $800 | |
41 to 60 | $1,100 | $10 | $810 to $1,000 | |
61 to 100 | $1,400 | $8 | $1,008 to $1,320 | |
More than 100 | $1,800 | $5 | $1,325 minimum | |
Water and Sewer Service Connections | Fee |
Sanitary connection (main tee and cleanout supplied and installed by applicant) | $2,000 |
Water connection (main tap and 0.75-inch meter supplied by village and installed by applicant) | $2,000 |
(Ord. 19-115, passed 12-2-2019)
Cross-reference:
Sudbdivision regulation fees, also found in § 152.24