§ 157.01 SCHEDULE ADOPTED.
   The following tables compromise the schedule of fees for land use in the village (current as the last revisions dated December 2, 2019), which shall be subject to change by resolution of the Village Board.
Building and zoning codes
Fee
Building and zoning codes
Fee
Existing building permits
 
Addition to non-residential structure (total building area under roof above grade)
$1.50 per square foot,
$500 minimum
 
Addition to residential structure 400 square feet and less
$100
 
Addition to residential structure more than 400 square feet
$200
 
Change of occupancy
$100
 
Historic buildings
$300
 
Level 2 alteration
$100
 
Level 3 alteration
$200
 
Relocated or moved buildings
$300
Other miscellaneous permits
 
Accessory structure (greater than 80 square feet)
$50
 
Decks (greater than 80 square feet)
$40
 
Driveway (if not part of a structure permit)
$50
 
Fences (taller than 2 feet)
$40
 
Signs (attached sign and free-standing sign)
$50
 
Solar energy permit
$40
 
Structure demolition
$50
 
Swimming pool permit (pools deeper than 2 feet)
$40
Non-residential structure permits
 
New construction (total building area under roof above grade)
$3 per square foot,
$1,000 minimum
Residential structure permits
 
Multiple-family (three-unit fee)
$500
 
Multiple-family per unit above three
$100
 
Single-family
$300
 
Two-family
$400
Violations
 
First violation per day past designated date
$70
 
Second violation per day past designated date
$150
 
Maximum fine per day past designated date
$750
 
Land Use Board actions
Fee
Home occupation special use permit
$40
Property zoning changes
$250
Special Board meeting
$550
Special use permits
$250
Zoning code variances
$250
Subdivision Regulations
Number of Lots
Base Fee
Additional Fee/Lot
Fee Range
Subdivision Regulations
Number of Lots
Base Fee
Additional Fee/Lot
Fee Range
Condominium review fees
$20 per unit
Construction plan review fees
Less than 5
$700
$0
$700
6 to 10
$700
$50
$750 to $950
11 to 20
$950
$40
$990 to $1,350
21 to 40
$1,350
$30
$1,380 to $1,950
41 to 60
$1,950
$25
$1,975 o $2,450
61 to 100
$2,450
$20
$2,470 to $3,250
More than 100
$3,250
$10
$3,260 minimum
Final plat fee
Less than 5
$150
$0
$150
6 to 10
$150
$30
$180 to $300
11 to 20
$400
$20
$320 to $500
21 to 40
$700
$15
$515 to $800
41 to 60
$1,100
$10
$810 to $1,000
61 to 100
$1,400
$8
$1,008 to $1,320
More than 100
$1,800
$5
$1,325 minimum
Preliminary plat fee
Less than 5
$150
$0
$150
6 to 10
$150
$30
$180 to $300
11 to 20
$400
$20
$320 to $500
21 to 40
$700
$15
$515 to $800
41 to 60
$1,100
$10
$810 to $1,000
61 to 100
$1,400
$8
$1,008 to $1,320
More than 100
$1,800
$5
$1,325 minimum
 
 
Water and Sewer Service Connections
Fee
Sanitary connection
(main tee and cleanout supplied and installed by applicant)
$2,000
Water connection
(main tap and 0.75-inch meter supplied by village and installed by applicant)
$2,000
 
(Ord. 19-115, passed 12-2-2019)
Cross-reference:
   Sudbdivision regulation fees, also found in § 152.24