(A) The owner or owners of any single-family dwelling or other building located on property as described in division (B) below that desires or is required to connect to the village’s water main extension pursuant to 52.020 of this chapter shall, before the connection is made, pay to the Village Clerk a connection fee as follows:
(1) A fee in the amount shown on the fee schedule of the village for each single-family dwelling connected to the water main extension; and
(2) A fee in the amount shown on the fee schedule of the village for each building other than a single-family dwelling that is connected to the water main extension.
(B) The connection fees as prescribed in division (A) above shall apply to each single-family dwelling or building required to be connected to the water main extension running westerly from the junction of West Tazewell Street and Hannibal Street a distance of 975 feet along the north side of Illinois State Route 9 to the westerly edge of Lot 4 and the extension that travels under Illinois State Route 9 from the west edge of Lot 4 to the center of Lot 5, being located in the southeast quarter (SE 1/4) of Section 13, Township 24 North, Range 4 West of the Third Principal Meridian as shown on a certain unrecorded plat of the water main extension dated 2-16-1996 and prepared by Austin Engineering Company, Inc. A copy of the plat is on file in the office of the Village Clerk.
(Prior Code, § 52.25) (Ord. 96-102, passed 6-17-1996)