10-21-12: UTILITIES:
   A.   Construction: All utility connections and lines shall be installed underground. Before any installations are covered, material and service must be inspected and approved by the city building department. During the construction period, temporary power poles and lines shall be allowed within the boundaries of the construction project; however, such poles and lines must be taken down within thirty (30) days after the final certificate of occupancy for the project is granted.
   B.   Easements: All utilities shall be placed within public road rights of way or specific rights of way or easements free of legal encumbrances. Multiple use of a given easement is encouraged. The final plat shall note all easements. (Ord. 2012.04, 1-18-2012)