§ 154.066 STREETS AND ALLEYS.
   (A)   Before approval and acceptance of any final plat, the developer shall prepare and submit three copies of the complete engineering plans of streets, alleys, curbs and gutters, storm sewers and drainage structures, and water and sanitary sewer improvements for the area covered by the final plat. The developer shall have these plans prepared by qualified engineer(s), subject to the approval of the plans by the city. The Zoning Administrator shall review the plans and specifications and, if approved, shall mark them "APPROVED" and return one set to the developer. If not approved two sets shall be marked, with the objections noted, and returned to the developer for corrections.
   (B)   After approval of the plat and of the plans and specifications, the developer shall cause a contractor to install the facilities in accordance with the approved plans and specifications and the regulations of this chapter. The developer shall cause the engineer(s) to design, stake, and supervise the construction of such improvements, and shall cause the contractor to construct the said improvements in accordance with these regulations.
   (C)   The city will inspect the installation of the improvements. After the improvements have been completed and have been found to be installed in accordance with the approved plans and specifications, upon receipt by the city of a one-year maintenance bond in the amount of 10% of the contract price from each separate contractor, along with three sets of "as-built" plans and one set of "as-built" sepias, and upon receipt of a letter of the contractor's compliance with these regulations, then the Zoning Administrator shall receive and approve for the city the title, use, and maintenance of the improvements.
(Ord. passed 4-20-2000)