(A) “As-built” plans shall depict an accurate account of the construction. Construction plans which are "rubber stamped" and submitted for the purposes of “as-built” plans are not acceptable.
(B) Three sets of "as-built" plans shall be required along with the final costs associated with the street construction, and shall be due prior to the filing of the final plat. Engineer of record shall certify in writing that all improvements meet the requirements of the approved construction drawings and city minimum standard specifications for streets along with the “as-built” plans.
(Ord. 2009-11-347, passed 11-3-09; Am. Ord. 2010-06-356, passed 6-1-10; Am. Ord. 2018-11-816, passed 11-6-18)