A. The floodplain board of Tombstone shall hear and decide appeals and requests for variances from the requirements of this chapter.
B. The floodplain board shall hear and decide appeals when it is alleged there is an error in any requirements, decision, or determination made by the floodplain administrator in the enforcement or administration of this ordinance.
C. Those aggrieved by the decision of the floodplain board, or any taxpayer, may appeal such decision to the superior court of Cochise County.
D. In passing upon such applications, the floodplain board shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter, and:
1. The danger that materials may be swept onto other lands to the injury of others;
2. The danger of life and property due to flooding or erosion damage;
3. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
4. The importance of the services provided by the proposed facility to the community;
5. The necessity to the facility of a waterfront location, where applicable;
6. The availability of alternative locations for the proposed use which are not subject to flooding or erosion damage;
7. The compatibility of the proposed use with existing and anticipated development;
8. The relationship of the proposed use to the comprehensive plan and floodplain management program for that area;
9. The safety of access to the property in time of flood for ordinary and emergency vehicles;
10. The expected heights, velocity, duration, rate of rise, and sediment transport of the floodwaters expected at the site; and
11. The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water system, and streets and bridges.
E. Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half (1/2) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, providing items in subsections D1 through D11 of this section have been fully considered. As the lot size increases beyond one-half (1/2) acre, the technical justification required for issuing the variance increases.
F. Upon consideration of the factors of subsection D of this section and the purposes of this ordinance, the floodplain board may attach such conditions to the granting of variances as it deems necessary to further the purposes of this ordinance.
G. The floodplain administrator shall maintain the records of all appeal actions and report any variances to the federal insurance administration upon request. (Ord. 1-1983, 2-16-1983)