3-1-8: PLUMBING; HEATING; ELECTRICAL WORK:
   A.   All new plumbing, heating and electrical work shall require inspection and no electrical, gas or water connection by the utility supplying such commodity shall be made until final approval by the city building inspector. (Replacement of an existing appliance, switch, control element, and/or convenient outlet by a similar or newer item that does not place additional requirements on the supply system is not to be considered new work.)
   B.   All electrical work shall be in conformance with the current adopted edition of the national electric code.
   C.   All plumbing work shall be in conformance with the International Association of Plumbing and Mechanical Officials uniform plumbing code (latest edition). For additions to existing plumbing the building inspector may authorize deviations from this code when in his opinion public health and safety are not jeopardized. (Ord. 174, 6-10-1957; amd. 1972 Code; Ord. 1-74-75, 8-21-1974)