§ 52.065 CONNECTION TO BUILDING SEWER TO CONFORM TO CERTAIN CODES AND SPECIFICATIONS.
   The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Codes or other applicable rules and regulations of the village, or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No. 9. All such connections shall be made gas-tight and water-tight. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installation.
(Prior Code, § 13.20.220)