§ 52.032 CONNECTION TO PUBLIC SEWER.
   When a public sewer becomes available, the building sewer shall be connected to the sewer within 60 days and the private sewage disposal system shall be cleaned of sludge and filled with clean bank-run gravel or dirt.
(Prior Code, § 13.20.130)