DOCUMENT | SPECIFICATIONS | |
1 | Application form | 1.1 Common address and legal description 1.2 Existing and proposed zoning 1.3 Names and addresses of all owners 1.4 Names and addresses of all design professionals or other consultants working on the project 1.5 Other information as required |
3 | Sketch plan | 3.1 Property lines 3.2 Major site features such as prominent vegetation, topography, water features, flood prone areas, existing buildings, and other relevant information 3.3 General layout of streets 3.4 General indication of land use 3.5 Approximate number and type of units |
4 | Project data | 4.1 Number of buildings and total number of dwelling units 4.2 Land area and lot coverage (percentage) 4.3 Approximate gross and net residential densities 4.4 Amount of usable and common open space 4.5 Parking calculations 4.6 Building heights 4.7 For major planned developments, project data in the preliminary application stage may represent approximate numbers. These figures must be updated for the final plat application. 4.8 Other calculations as may be required |
5 | Site plan of existing conditions | 5.1 Existing streets, easements, utilities and public improvements 5.2 Significant physical features on and around the site 5.3 Contour lines (two-foot intervals) 5.4 Water courses and existing drainage facilities 5.5 Wooded areas and isolated trees of six inches or more in diameter 5.6 Existing buildings with an indication of those to be removed 5.7 Surrounding land use, zoning, and public facilities |
6 | Preliminary site plan | 6.1 General location of buildings, structures, and other improvements 6.2 Common open space and use of open space 6.3 Off-street parking facilities and number of spaces to be provided 6.4 Location of streets and sidewalks and an indication of which areas will be privately maintained or dedicated to the village 6.5 Illuminated areas 6.6 All utilities including storm drainage, sanitary sewers, and water service 6.7 General areas of landscaping and type of landscape treatment 6.8 Screening or buffering treatment along the perimeters |
TABLE 154-2: SPECIFICATIONS FOR REQUIRED PLANS AND DRAWINGS IN TABLE 154- 1 | ||
DOCUMENT | SPECIFICATIONS | |
10 | Final development plan | 10.1 Legal description and property survey by a registered land surveyor of the entire area within the planned development 10.2 Survey data sufficient to reproduce any line or reestablish any monument 10.3 All highways, streets, alleys, blocks, lots, parcels, public grounds, easements, and rights-of-way 10.4 The length of boundary lines of all streets, alleys, blocks, lots, required setbacks, and yards, public grounds, easements, and rights-of- way and information sufficient to derive the length of these lines by simple calculation 10.5 The width of all rights-of-ways, easements, and location of utilities 10.6 The location dimensions and configuration of all proposed structures and the internal uses to which each building shall be used, in sufficient detail to determine off-street parking calculations 10.7 All curb cuts, driving lanes, parking, and loading areas , public transportation points, and illuminated facilities 10.8 The location and area of all usable and recreational open space 10.9 Recreational facilities to be included in the recreational open space areas |
13 | Landscape development plan | 13.1 Screening and buffering treatments along the perimeter of the development 13.2 Existing plantings and vegetation that will remain, and methods that will be used to protect the existing growth 13.3 Indicate the number, type, and size of trees, shrubs, and ground cover to be planted and their placement 13.4 Indicate other landscaping elements such as walls, fences, decorative paving treatments, or street furniture 13.5 Indicate other natural features such as ponds, streams, and similar features |
All plans must include a date, north arrow, and name of development. All plans, except the sketch plan, should be drawn to scale or with accurate measurements and dimensions sufficient in detail to ascertain the location and size of various elements of the drawing. |