1307.01 General.
1307.02 Permit fees for buildings and structures.
1307.03 Plan review and early start phased permit fees.
1307.04 Electrical.
1307.05 Plumbing.
1307.06 Comfort heating, ventilating, and cooling. (HVAC).
1307.07 Refrigeration and pressure piping.
1307.08 Administrative fees.
1307.09 Investigation of illegal or unauthorized work.
1307.10 Re-inspection.
1307.11 Special inspections or services.
1307.12 Swimming pools.
1307.13 State of Ohio fees.
1307.14 Business fees.
CROSS REFERENCES
Permits-see BLDG. Ch. 1305
Home improvement and remodeling license fees-see BLDG. 1313.04
Sign Code permit fees-see BLDG. Ch. 1383
Upon the filing of an application for a permit required pursuant to the provisions of this Part Thirteen-Building Code the applicant shall pay the fee as hereinafter set forth. (See Section 1305.02 for permits not required.)
(Ord. 476-18. Passed 12-4-18.)
In addition to the permit fees listed below, a Certificate of Zoning Compliance shall be required for all new construction of buildings or structures and/or new additions to existing buildings and structures regulated by the Ohio Building Code and/or the Residential Code of Ohio. A Certificate of Zoning Compliance shall also be required for all residential and commercial accessory structures, ramps, decks, regardless of size, for all fences regardless of height, and all pools greater than 24" in depth.
(a) Residential 1, 2, or 3 family dwellings
1. New construction, additions, alterations (interior or exterior), & their accessory structures.
Base fee $60.00
Additional fee of $0.20 per gross square foot (100 sq. ft. minimum per alteration)
2. Residential non-structural exterior alterations.
$60.00 per alteration (roofs, siding, doors, windows)
(b) Commercial buildings and 4 family or larger residential buildings - new construction, additions or alterations (interior or exterior).
Base fee $75.00
Additional fee of $0.20 per gross sq. ft. (100 sq. ft. minimum per alteration)
(c) Festivals and/or tents.
First Tent $75.00 + $25.00 for each additional tent
Buildings not exceeding 6,000 cu. ft. $75.00
Buildings 6,000 to 50,000 cu. ft. $100.00
Buildings in excess of 50,000 cu. ft. $100.00
plus $3.00/1,000 cu. ft. or fraction thereof
Removal of in-ground tanks $75.00 for first tank, plus $25.00 for each additional tank
(e) Zoning appeals. $200.00
(f) Signs. (See Title Nine of this Part Thirteen Building Code.)
Note: For sign base fees see Section 1383.09 (a), (b)
(g) Occupancy permits.
Certificate of Occupancy $75.00
Partial Certificate of Occupancy $75.00
(h) Flood plain permits.
1. Floodplain Development permit, each application.
a. 1, 2, or 3 family dwellings $60.00
b. All other occupancies $100.00
2. Community Acknowledgement form, each application for all occupancies. $50.00
(i) Parking lots.
Constructing new, paving/re-paving and/or resurfacing, more than five spaces $75.00
(j) Manufactured Homes, per unit $250.00
(k) Certificate of Zoning Compliance $50.00
(Ord. 476-18. Passed 12-4-18.)
(a) Plans submitted for examination under the Ohio Building Code or its associated mechanical and electrical codes.
1. Plan Examination: $75.00 base fee;
plus $.03 (cents) per square foot (100 sf min.)
2. Resubmissions. The fees set forth in section 1307.08(a) shall include one (1) initial plan review and one (1) resubmission plan review to resolve issues resulting from correction letters. The fee for plan review after the first (1st) resubmission shall be one hundred fifty dollars ($150.00) and three hundred dollars ($300.00) for each additional resubmission.
3. Amended construction documents, after initial plan approval: $100.00 per submission
4. Phased plan approval, after initial plan approval: $100.00 per phase submission; plus $.03 (cents) per square foot (100 sf min.)
(b) Plans submitted for examination under the Residential Code of Ohio.
1. Residential plan examination: $50.00 base fee; plus $.03 (cents) per square foot (100 sf min.)
2. Residential resubmissions. The fees set forth in section 1307.08(b) shall include one initial plan review and one resubmission plan review to resolve issues resulting from correction letters. The fee for plan review after the first (1st) resubmission shall be seventy-five dollars ($75.00) and for each additional resubmission.
3. Amended construction documents: $50.00 per submission.
(c) Early Start Phased Permit (ESPP)
1. Persons applying for permits for interior alterations which do not involve structural changes may apply for an Early Start Phased Permit (ESPP). Construction work under an ESPP is limited to work up to the rough-in-stage and no work may be concealed.
2. Issuance of an ESPP allows work to commence while plans are being reviewed prior to permit issuance. Inspections will not be made for any work performed under an ESPP until permits for the work are issued.
3. All work done under an ESPP will be performed at the applicant's risk. The Division of Building Inspection is under no obligation to approve work performed under an ESPP not conforming to the applicable codes. The Division of Building Inspection may order removal of some or all work performed under an ESPP not conforming to the applicable codes. The Division of Building Inspection or City of Toledo shall not be held liable for any damages associated with issuance of an ESPP, wherein work does not conform to the applicable codes.
4. Early Start Phased Permit (ESPP) fees:
a. Building permits - one half of one percent (.005) of the building permit valuation (minimum $100.00)
b. Electrical, Plumbing, HVAC, Hydronic, or Refrigeration & pressure piping permits; $100.00 each
5. Early Start Phased Permits (ESPP) shall expire upon issuance of a permit for the work or ninety days after issuance, whichever is first.
(Ord. 476-18. Passed 12-4-18.)