1042.11 INSPECTION REQUIRED.
   As soon as the sanitary sewer and/or the storm water sewer installation is completed, the property owner, or his or her agent, shall call the Village Engineer for inspection of the entire system installed. No backfilling will be permitted prior to the inspection. At the time of arrival of the inspector, the two copies of the permit must be presented to him or her. The inspector will sign one copy of the permit, if the system meets with approval and return the permit to the owner. The homeowner's signed copy shall constitute a use permit. The other copy will be kept by the inspector. Back filling shall only be permitted after approval has been given by the inspector.
(Ord. 1963-6. Passed 9-10-63; Ord. 2007-14. Passed 12-18-07.)