7-2-9: INSPECTIONS PRIOR TO COVERING:
Whenever a connecting sewer shall be constructed as herein provided, the person or persons constructing the same and making the connection shall leave the same uncovered and open until the work shall be inspected and approved by the Sewer Commissioner, and all connections so made shall be made in such a manner as the Sewer Commissioner shall direct. (1986 Code § 19-106)