§ 157.569 FEE FOR FAILURE TO OBTAIN BUILDING PERMIT PRIOR TO CONSTRUCTION.
   Failure or refusal to obtain a building permit prior to the construction, erection, enlargement, alteration, extension, conversion, or relocation of any structure or use of land for which a permit is required shall result in a doubling of the fee required when application of the permit is made.
(Prior Code, 7 TCC 1-31(o))