(A) Electrical installations in parks shall conform to the National Electrical Code, latest edition.
(B) The electrical distribution system in all parks shall be underground.
(C) MMH site feeder circuits shall be rated for a capacity of not less than 100 amperes of 120/240 volts. Additional secondary receptacles of not less than 50 amperes each may be provided at manufactured/mobile home sites.
(D) The total load for a park shall be calculated on the basis of 16,000 watts per mobile home site. The minimum allowable demand factors which may be used in calculating load on feeders and service are as follows.
Number of Manufactured/Mobile Home Sites Served | Demand Factor (Percent) |
Number of Manufactured/Mobile Home Sites Served | Demand Factor (Percent) |
1 | 100 |
2 | 55 |
5 | 33 |
10 | 27 |
20 | 25 |
50 | 23 |
100 or more | 22 |
(Prior Code, 7 TCC 1-22(f))