§ 34.01 FEE SCHEDULE.
Tatamy Borough 2020 Fee Schedule
Adopted 1-6-2020; Effective 1-1-2020
Tatamy Borough 2020 Fee Schedule
Adopted 1-6-2020; Effective 1-1-2020
Permits and Fees
Items with an (*) after them require inspection by an approved inspector, paid for by the requestor; the type of inspection (electrical, plumbing, structural and the like) will be determined by the permit activities performed
   Administration Fee
      An administrative fee of 15% will be added to all third party reviews to cover internal administration costs
 
   Buildings and Structures
      Commercial/industrial buildings (*)
         Base fee for building permit (plus following fee)
$500
         New construction - fee of $0.25/sq. ft.
      Conditional use hearing
$600
      Curative amendment or borough ordinance changes
$5,000
         Subsequent hearings per each
$500
      Residential building/zoning permits (*)
         Base fee for all building permits (plus following fees)
$50
            up to 1,500 sq. ft.
$200
            from 1,501 to 2,000 sq. ft.
$250
            from 2,001 to 2,500 sq. ft.
$300
            from 2,501 to 3,000 sq. ft.
$350
            from 3,001 to 3,500 sq. ft.
$400
            plus $15 per 200 sq. ft. above 3,500 sq. ft. or portion thereof
      Zoning Hearing Board, initial hearing
$900
      Zoning Hearing Board, subsequent hearing (each)
$500
   Certificate of Occupancy
      For all above/in ground swimming pools or outdoor hot tubs (*)
$20
      For all occupied structures, buildings or units (*)
$25
   Claims Municipal
      Delinquent account collection fees
 
         Preparation and filing of municipal liens
$100
         Attorney fee for preparation of delinquent refuse account collection letter
$50
         Attorney fees incurred in the collection of delinquent accounts including, but not limited to, district justice and/or common pleas actions
$125 per hour
            Additionally, the owner shall be responsible for all costs of collection in addition to attorney fees including, but not limited to, filing fees and court fees as may be paid by the borough
 
   Dumpster/POD/Temporary Storage Permit
   $15
   Construction Trailer Permit
      Per trailer, per year or fraction thereof
$50
      plus $500 escrow
   Fee Schedule to Comply with IMPC § 302.4
      For 2-man job
 
         Equipment (mower and weed wacker)
$30
         Gas
$15
         Hauling and bagging
$10
         Wages
$45
      For a total of $100
$100 per hour
   Fines and Penalties
      As set by law, referenced externally
 
      Failure to acquire permit and/or pay fee prior to the inception of any individual activity covered in the fee schedule will incur a penalty or 25% of the individual activity’s fee, or $50, whichever is greater; the penalty applies to each permit and/or fee, individually
 
   Fire and Other Natural Disaster Rebuilding Permit
      Industrial/commercial/income producing residential units (*)
 
         Base fee for all rebuilding permits (plus following fees)
$50
            up to 1,500 sq. ft.
$200
            from 1,501 to 2,000 sq. ft.
$250
            from 2,001 to 2,500 sq. ft.
$300
            from 2,501 to 3,000 sq. ft.
$350
            from 3,001 to 3,500 sq. ft.
$400
            plus $15 per 200 sq. ft. above 3,500 sq. ft. or portion thereof
 
      Residential dwelling unit rebuilding permit (*)
$50
   Floodplain Zoning Permit Application Submission Fee
$75
   Grading Plan Review
      Commercial construction
Minimum $1,000 or as per engineer review
      In-ground pools
$500
      New single-family dwelling residential
$750
   Interior Alterations and Renovations
      Industrial/commercial/income producing residential units (*)
 
         Base fee for all building permits (plus following fees)
$50
            up to 1,500 sq. ft.
$200
            from 1,501 to 2,000 sq. ft.
$250
            from 2,001 to 2,500 sq. ft.
$300
            from 2,501 to 3,000 sq. ft.
$350
            from 3,001 to 3,500 sq. ft.
$400
            plus $15 per 200 sq. ft. above 3,500 sq. ft. or portion thereof
 
      Residential dwelling unit (*)
 
         Building permit
$50
   Miscellaneous Structures
      Curb and sidewalk installation (new and replacement) (*)
$50
         (Commercial/industrial/income producing residential units)
         Must meet borough specifications, plus $500 escrow
      Curb and sidewalk installation (new and replacement) (*)
$25
         (Residential dwelling units)
         Must meet borough specifications, plus $100 escrow
      Demolition permit (commercial/industrial/income producing residential units, per structure or unit) (*)
$100 plus $1,000 escrow
      Demolition permit (residential dwelling units, per structure) (*)
$35 plus $500 escrow
      Driveway (commercial/industrial/income producing residential units) on borough streets and roads, state highway permits required on state roads
$50
      Driveway (residential dwelling units)
$25
      Fences - all (split rail, picket, stockade and the like)
$25
      Fireplaces/stoves/chimneys/furnaces (new and replacement) (*)
$25
      Sheds, decks (*)
$25
         Roofed patios, sun rooms, covered decks (*)
$50
      Signs
         Billboards (*)
$100
         Permanent signs (new) (*)
$50
         Permanent signs (replacement) (*)
$25
      Swimming pools (above ground) or outdoor hot tubs (*)
$35
   Moving Permit (ingress and egress, each)
$5
   Professional Services
      Administrative assistant
Actual cost of hours needed
      Engineer
$117/$110.7 5 per hour
      Sewer Authority Engineer
$127/$111.5 0 per hour
      Solicitor
         Litigation
$200 per hour
         Standard
$125 per hour
      Zoning Hearing Board Solicitor
   $65 per hour
   Recreation Fee
      To be paid when building permit is issued
 
         For each new industrial/commercial/income producing residential unit plus:
$10,780
            per each 100 cubic feet or fraction thereof
$1
         For each new residential dwelling unit
$3,080
   Refuse Collection Fee
      Paid in semi-annual installments
   $200 yearly
   Requests for Public Records
      Certification of a public record
$5
      Facsimile/microfiche/other media
Actual cost
      Photocopies (borough supplied)
$0.25
      Postage
Actual cost of the mailing
      Returned check/insufficient funds bank fee
$50
      Specialized documents ( blue prints, color copies, non-standard sized documents)
Actual cost
         Note: prepayment will be required if the fees are expected to exceed $100
 
   Stake-Out Fee
No charge unless the property owner has requested the service, in which case, the property owner will be responsible for the Borough Engineer fees
   Subdivision and Land Development Ordinance Book (SALDO)
$35
   Tatamy Borough Sewer Project Manual
$100
   Tatamy Borough Standard Sewer Specifications Book
$25
   Tree Trimming Fee in Compliance with Ordinance 53-1968
      For 2-man job
 
         Equipment
$30
         Gas
$15
         Hauling and bagging
$10
         Wages
$45
      For a total of $100
$100 per hour
   UCC Code Appeal
Per Nazareth COG
   UCC Education Fund Fee
$4.50
   Yard Sale Permit
      After first yard sale and community yard sale
$10
   Zoning Ordinance Book
$25
Land Development and/or Subdivision Fees
   The following escrow and fee schedule (Columns A and B below) includes costs for administrative, engineering and legal activities appropriate to the complexities of land development and/or subdivision
 
   If, in the opinion of Borough Council, the actual costs incurred by the borough for advertising, transcription, legal services, engineering services and professional consulting services exceeds the amount of the escrow deposited as indicated by the below schedule, no zoning/building permit shall be issued until such time as the appellant shall deposit with the borough a sum sufficient to reimburse the borough for the aforesaid costs
 
   The borough may, during the course of the review of any application, require the applicant to deposit that amount sufficient to reimburse ongoing costs to the borough; failure to pay said sums within ten days of billing thereof shall be sufficient grounds for the denial of subdivision or land development approval
 
   The following deposits (items a. through g. in Column A below) shall be set up as an escrow account, to be replenished by the applicant when the escrow account level reaches 50% or less; these escrow accounts will also act as construction escrow accounts to cover ongoing project costs as detailed above
 
   With each preliminary or final plan submissions in the review process the following fee schedule (items a. through g. in Column B below) will apply; items h. and i. are one-time fees.
 
   Escrow and fee schedule
 
 
(A) Escrow
(B)
Fee
   a. A 2 lot subdivision
$2,000
$500
   b. A 5 or less lot subdivision
$5,000
$500
      plus for each additional lot 3, 4 or 5
$100
$100
   c. All single-family dwelling unit development
$5,000
$1,000
      plus for each lot over the first 10 lots
$100
$100
   d. All multiple-family dwelling unit development
$5,000
$500
      plus for each dwelling unit after the second
$200
$100
   e. Commercial/industrial, either subdivisions or development
$7,500
$1,000
      plus for each acre or fraction thereof
$100
$100
   f. Planned residential development
$5,000
$500
      plus for each dwelling unit after the second
$200
$100
   g. Land development submission
$5,000
$500
      plus for each acre or fraction thereof
$200
   h. Sketch plan submission
$300
   i. Pre-construction meeting (actual cost to be charged to the developer)
$50 minimum
Sewage Permit Fees
   Following fees from 1. through 4. as per current SEO Fee Schedule and are subject to change without modification of this fee schedule
 
   1. Test pit profile analysis
 
      1.1 Permit application (single lot) - the property owner or his or her representative will be required to set up an appointment with the Sewage Enforcement Officer (SEO) to arrange for evaluation of the pit, collection of necessary site data, taking of necessary slope readings and notation of all soil mapping information. The owner is required to supply the necessary excavation and any information pertinent to the application. At this time the SEO will try to answer any questions that the owner may have in reference to his or her system planning or permit procedure
 
         Per pit evaluation
$75
         Quantity evaluation (per perc site)
$75
      1.2. Subdivision planning - the subdivision is required to supply a drawing of the proposed subdivision delineating proposed subsurface disposal areas (drawn to scale) for each lot and shall have physically marked these areas in the field according to their individual location on the subdivision plan; at this point the subdivider will contact the Borough SEO to set up an appointment to arrange for the SEO’s observation of the pit; the developer shall retain a soil scientist, or other qualified individual, to evaluate individual probes; this is typically performed for general site suitability and planning module preparation; if either soil conditions or slopes exist which would indicate unsuitable sites, the subdivider may have to incorporate this area into acceptable surrounding proposed plots; the subdivider must provide all necessary equipment and labor
 
         Per pit observation
$75
         Quantity observation (per perc site)
$60
   2. Percolation test (limited to six holes)
      Complete
$325
      Observation
$200
      Partial
$265
   3. On-lot disposal permit application fees
 
      Final inspection (sand mound)
$225
      Final inspection (standard system)
$100
      Minor repair (building sewer/transmission line)
$85
      New
$85
      Pre-construction inspection
$100
   4. System malfunction (per hour)
$55
   5. Sewer lateral connection fee
      Connection fee (per EDU)
$4,011
   6. Sewer lateral inspection
$84 per hour
   7. New or additional sewer lateral installation
 
      All work is contracted and paid for by the applicant, using an approved and licensed contractor. The applicant is responsible for all costs associated with estimate preparation, engineering, inspection and any other fees associated with the project. The new lateral is only provided to the applicant’s property line (edge of borough’s right-of-way)
 
   8. Fee for bounced sewer payment checks
$50
   9. Water termination processing fee
      Reconnection fee
$30
      Shut off fee
$30
Miscellaneous
   Mailbox reimbursement
      Reimbursement for mailbox damaged by borough
   $50
Mileage - current federal guidelines and amounts apply (2020 rate $.575)