7-3-9: RESTORATION:
   A.   Backfilling: Any person making an excavation or tunnel in or under any public sidewalk, street, alley, or other public place in the City shall restore the surface thereof to its original condition. If the excavation is within the limits of a street, alley, driveway, or sidewalk, the trench shall be backfilled with select granular material properly compacted and repaired in accordance with the City’s standard details.
   B.   Restoration of Pavement and Concrete: Any opening in a paved or improved portion of a street, alley, or sidewalk shall be properly restored by the applicant, in compliance with the City’s standard detail and subject to the supervision of the Superintendent of Public Works or, if such work is not done within ten (10) days after restoration is possible, the City may approve an extension or restore the surface, using City Crews or a third-party, and charge all costs to the permittee. Temporary patches such as cold patch or gravel are not permitted in any street, alleyway, approach, pathway, or sidewalk beyond ten (10) days unless approved by the City Engineer.
   C.   At the completion of work, all marking flags shall be removed by the applicant.
   D.   The applicant shall contact the City Engineer for final inspection of the restoration. (Ord. 2021.08, 6-21-2021)