The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe jointing, testing and backfilling the trench shall all conform to the requirements of the State Health Code, State Building Code, Uniform Plumbing Code and all applicable standards and specifications of the federal, state, county and municipality.
(Ord. 2015-6, passed 6-25-2015)