1022.02 CLEAR PATHWAY REQUIRED.
   Not later than twenty-four hours after snow has ceased to fall, it shall be the duty of the owner of the property in the Borough, and of the owner or his or her agent in charge of unoccupied property, to cause to be cleared a pathway not less than thirty inches wide in the sidewalk of such property. In the case of corner lots, the sidewalks along both streets shall be so cleared and kept clear, including the extensions of such sidewalks to the roadways of such streets. The snow and ice may be piled on the curb side of the pathway, but shall not be piled on the roadway or the gutters thereof. It shall further be the duty of the owner of the property in the Borough, when a fire hydrant is located on such occupied property, that the fire hydrant have a clear path and snow and ice shall be removed within a 3-foot perimeter of the hydrant.
(Ord. 907. Passed 11-13-95; Ord. 01-2024. Passed 3-11-24.)