(A) Access along Airport Highway shall be reviewed relative to the distance from other drive approaches and from roadway intersections. In some instances, a frontage road shall be provided to allow access to other parcels and to the adjoining parcel(s). In other instances, cross access easements and/or a shared drive approach shall be required for adjoining parcels, unless specially waived, in writing by the Village Engineer or the Ohio Department of Transportation. Access shall be reviewed by the designated Village Engineer, Planning Commission and/or the Ohio Department of Transportation. A traffic impact study shall be required by the developer if the proposed use of the property generates 100 or more peak hour trips, consistent with the Institute of Transportation Engineers (ITE) Generation Manual, unless such requirement is specifically waived, in writing, by the Village Engineer.
(B) If requested, where there is a change of use to an existing development, the designated Village Engineer, the Planning Commission or Ohio Department of Transportation may make a recommendation to close access points within the overlay district, which are deemed to be hazardous.
(Ord. 2023-03, passed 2-27-2023)