§ 152.486 PROCEDURAL REMEDIES WHEN DEMOLITION BY NEGLECT IS DETERMINED.
   At the Town Planner’s discretion, offenders may be required to:
   (A)   Provide a sealed report from a structural engineer who has inspected the site and consult with the Town Planner who will consult with the State Historic Preservation Office on the submittal and ask for additional information if needed, as well as the Town Building Official and Town Engineer. The report must contain a breakdown of the structural integrity of the building, including the roof, walls, floors, windows, doors, and foundation. A detailed description of each structural component that needs work must be provided with the remedy for repair, along with documentation that the component is 50% or more structurally unsound.
   (B)   If water infiltration is occurring, provide a sealed site plan from an engineer showing solutions to the stormwater issue. The calculations will be reviewed by the Town Engineer.
   (C)   Submit two sealed sets of building plans and a site plan, along with any exhibits that are needed for the review. Town staff will work through the review process prior to taking the recommended drawings and exhibits to the Swansboro Historic Commission for consideration of a certificate of appropriateness to facilitate and document the corrective action needed.
(Ord. 2023-O1, passed 3-13-2023)