5.8   Required surveys.
   1)   In all zoning districts, a foundation survey is required when piling or alternate foundation is installed before proceeding with erection of any building.
   2)   In all districts a final survey must be submitted prior to a final inspection and before a certificate of occupancy can be issued.
   Final survey must include name and address of owner, physical address of property, exact boundary lines and minimum setback lines and percentage of lot covered by roofed structure(s). All buildings and other structures on lot must be shown including eaves, utility platforms, decks and stairs. Driveways and walkways must denote materials used. Decks must be labeled as roofed or open.
(Ord. No. 2006-53, 12-5-06; Ord. No. 2020-10, 12-1-20)