8-2-13: SEWER LINE EXTENSIONS:
Whenever an extension of the city sewer line is required to serve an applicant, or group of applicants, extension will be made under the following terms and conditions by the applicant:
   A.   Sizing; Costs: All line extensions shall be sized to provide adequate service. In the event that the city system plan requires a larger line size than is required to serve the applicant's needs, the applicant will not be required to absorb the difference in investment between the applicant's required line size and the line size required by the plan; but in no event shall the extension costs to applicant be based on lines smaller than those needed for applicant's domestic service. The city shall be the sole judge of proper line sizing in any new construction and shall be the sole judge of the line size cost to the applicant.
   B.   Costs Paid By Applicant: The investment in the line extension required to serve the applicant's domestic requirements as specified above will be paid in total by the applicant requesting the line extension.
   C.   Right-Of-Way And Easements: All lines will be constructed in existing public roads, streets, city owned lands, alleys or easements. The applicant shall furnish such rights of way in the form of duly executed easements without charge to the city and shall assist the city in securing other rights of way necessary to provide service over property not owned by said applicant.
   D.   Special Conditions: Special conditions which affect the furnishing of sewer service to an applicant or group of applicants such as elevation, terrain, volume required in existing mains, and other conditions resulting in increased costs to the city in providing sewer service shall be taken into consideration by the city and the cost thereof shall be added to the tapping fee. (Ord. 1985-14, 1-21-1986)