9-3-8: SUPERVISION AND INSPECTION:
   A.   The Stormwater Division shall perform required inspections, or cause to be inspected, all work done pursuant to permits to ensure the enforcement of the provisions of this chapter. Notification shall be given to the Stormwater Division at least twenty-four (24) hours prior to the commencement of any work and within twenty four (24) hours after implementing the SWPPP and ECP. The completion bond shall not be released without an inspection made to determine satisfaction of all applicable provisions of this chapter.
   B.   For construction sites who have filed a Notice of Intent (NOI), as defined in Utah Code, with the State of Utah, the applicant shall retain qualified personnel to inspect the sediment control measures: 1) at least once each two (2) weeks and after a storm event which precipitated 0.5 inch of water or more within twenty four (24) hours. The inspector shall prepare written reports of each inspection and make recommendations for correcting any BMP found not performing as intended. A copy of each inspection shall be kept on site until such time as the disturbed area has been permanently stabilized. A copy of the report shall also be submitted to the office of the Stormwater Division, when requested.
   C.   The applicant shall implement all recommendations of the inspector, or the Stormwater Division, to correct any sediment control measure (BMP) found not performing as intended. (Ord. 710, 12-17-2008, eff. 1-1-2009; amd. Ord. 953, 10-26-2022)