9-3-3: APPLICATION FOR PERMIT:
Applications shall be made by the owner or operator of the property on which the work is being done. In the case of work within a public right of way, by the firm, public utility, public agency or corporation actually doing the work, or in the case of work within a private road or private road right of way, by the owner of the road or association responsible for the maintenance of the road. Applications for all permits shall be made to the Public Works Stormwater Division as provided, and state the purpose therefor, the person, firm, public utility, or corporation doing the actual work and the name of the person, firm, public utility, or corporation for whom or by which the work is being done, and shall contain an agreement that the applicant will comply with all ordinances and laws of Summit County, the state of Utah, and the federal government relating to the work to be done. The application shall also provide for an agreement that the applicant shall indemnify the county for any loss, liability, or damage that may result from or because of the making, placement, existence, or manner of guarding or constructing any such excavation. The application shall be accompanied by a stormwater pollution prevention plan and erosion control plan (SWPPP or ECP). Said plan shall have a drawing of the location of the intended excavation, grading, filling or stripping of vegetation, and the pertinent dimensions thereof. The SWPPP shall include all requirements set forth in the most current State of Utah general permits for stormwater. The SWPPP and ECP shall employ best management practices (BMPs) and shall contain the layout, typical sections and details of the erosion control and sediment control measures to be used. Options of various BMP's can be found, but not limited to, in the Construction BMP guidance section on the Summit County Stormwater Website (https://www.summitcounty.org/755/Storm-WaterMS4). (Ord. 710, 12-17-2008, eff. 1-1-2009; amd. Ord. 953, 10-26-2022)