STEP 1 | Calculate Points. Determine the number of Site Points required for development, based on the size of the Developed Area, and the number of Parking Lot Points based on the number of parking spaces. |
STEP 2 | Determine Plant Requirements. Determine the quantity, type, and size of plant materials needed to meet point requirements. |
STEP 3 | Determine Additional Requirements. Determine whether Residential, Subdivision or other buffers apply to the development. |
STEP 4 | Develop a landscape plan. Develop a landscape or planting plan with plantings that meet point requirements, including any applicable buffer(s). |
(Ord. passed 2-3-2011, § 2.32.050)