(A) Due to the fact that inspections vary depending on whether the project is or includes a structure, street, sewer, water, and the like, contractors shall be required to contact the Engineering and Inspections Office to acquire a list of required inspections for each individual project.
(B) In the event any contractor fails to call for an inspection, the project may be stopped until an inspection can be made.
(C) The specific inspections required for each project shall be determined by the Engineering and Inspections Office. The Engineering and Inspections Office should include guidelines with the Manual of Construction Guidelines addressing the type of inspections needed for certain projects; however, the Engineering and Inspections Office shall maintain the discretion and authority to require any necessary testing and/or inspections depending on any individual project.