§ 52.04 CROSS-CONNECTION INSPECTION.
   (A)   No water shall be delivered to any structure hereafter built within the city or within areas served by city water until the same has been inspected by the purveyor for possible cross-connections and has been approved as being free of same.
   (B)   Any construction for industrial or other purposes which is classified as hazardous facilities where it is reasonable to anticipate intermittent cross-connections, or as determined by the Director of Public Works, shall be protected by the installation of one or more backflow prevention devices at the point of service from the public water supply or any other location designated by the purveyor.
   (C)   Inspections shall be made at the discretion of the Director of Public Works on all buildings, structures, or improvements of any nature now receiving water through the city’s system, for the purpose of ascertaining whether cross-connections exist. Such inspections shall be made by the purveyor.
(Ord. 346, passed 4-13-1992)