(A) The fees for permits shall be set forth in the following schedule. Copies of this schedule shall be on file in the Village Clerk’s office and in the office of the Building Inspector:
Type of Work | Permit Fees |
Minimum base fee | $50 |
Type of Work | Permit Fees |
Minimum base fee | $50 |
Air conditioning (roof mounts) 5 tons and over | $150 |
Auctioneers | $175 |
Awnings (business) | $50 |
Awnings (house) | $25 |
Building and construction (general) over $250 | |
First $1,000 in value | $150 |
Each $1,000 or part thereafter | $25 |
Building site inspection | $50 |
Canopies over 50 feet in width | $150 |
Carport | $25 |
Catch basin (each) | $50 |
Central air conditioning (residential) electrical inspection fee | $50 |
Concrete work | |
Under $2,000 | $75 |
Work over $2,000 (per $1,000 or part thereof) | $25 |
Cross-connection valve (dual check valve or RP2) | $25 |
Curb (to break curb) | $30 |
Deck | $75 |
Fences | |
Commercial and industrial (for first 50 feet) | $75 |
(for each 50 feet thereafter) | $50 |
Residential (six feet maximum) | $25 |
Fire alarm | |
First $1,000 in value | $150 |
Each additional $1,000 in value or part thereafter | $25 |
Fireplaces - woodburning or gas | $100 |
Floor drains (each) | $25 |
Footing and foundation inspection | $100 |
Framing inspection | $100 |
Furnace installation electrical inspection fee | $75 |
Garages (construction) | $150 |
Garages (wrecking) | $125 |
Heating plants (hot water/steam) | $75 |
Hot water heater (replacement) | $50 |
Manholes (each) | $100 |
Patios (10-foot x 10-foot) | $50 |
Paving (asphalt) | |
First $1,000 in value | $50 |
Each $1,000 or part thereafter | $25 |
Over $3,500, additional inspection fee | $50 |
Plan review | $50 |
Plumbing in bathrooms (per fixture) | $25 |
Pre-fab shed | $25 |
Re-roofing or new roof | |
Factory/plant | |
To 7,000 square feet | $200 |
7,500 square feet | $225 |
12,500 square feet and up | $300 |
Residential | $200 |
Sanitary storm sewer connections (per connection) | $200 |
Satellite dish | |
Cost of up to $3,000 | $150 |
Exceeding $3,000 (per $1,000 or part thereof) | $75 |
Services (electrical) | |
100 ampere service | $150 |
200 ampere service | $160 |
400 ampere service | $165 |
600 ampere service | $175 |
800 ampere service | $185 |
1,000 ampere service | $185 |
1,200 ampere service | $225 |
1,600 ampere service | $235 |
2,000 ampere service | $245 |
3,000 ampere service | $305 |
4,000 ampere service | $365 |
15 and 20 ampere branch circuits | |
0-50 circuits (each) | $20 |
51 or more circuits (each) | $20 |
Branch circuits exceeding 20 amperes all circuits | $20 |
Motor or device | |
Each motor or device | $40 |
Minimum electrical fee | $55 |
Reinspection electrical fee | $50 |
Temporary wiring | $60 |
Extra inspection fee (per hour) | $60 |
Carnivals (per hour) | $60 |
Vaults (except utility owned) | $60 |
Burglar alarms (per hour) | $60 |
Aural and/or visual communications (per hour) | $60 |
Antenna systems (per hour) | $60 |
Siding | |
First $2,000 in value | $100 |
Each $1,000 or part thereafter | $25 |
Signs | |
Billboard signs (annual inspection) | $150 |
Electrical inspection for illuminated signs | $60 |
Erecting new sign (per square foot) | $1.50 |
Street openings | $675 |
Swimming pools | |
2,500 gallons or less | $75 |
Over 2,500 gallons | $125 |
Tree trimming | $75 |
Tuckpointing | (See: General Building and Construction) |
Underground tanks | (See: General Building and Construction) |
Removal (per tank) | (See: General Building and Construction) |
Digging up and re-lining (per tank) | (See: General Building and Construction) |
Ventilators/dust collectors (H.V.A.C.) industrial | $100 |
Windows | (See: General Building and Construction) |
Wrecking of building | |
First $1,000 | $150 |
Each $1,000 thereafter | $50 |
Commercial | $500 |
Final inspection fee for each trade (electrical, plumbing, roofing and carpentry) | $25 |
(B) Water transmission and sanitary sewer connection fees.
(1) All new users, commercial and/or residential, shall be required to pay a permit fee to access the village’s water distribution system and the village’s sanitary system. This includes all new construction.
(2) The permit fee shall be $1,000 which shall include the connection to both systems, the location of the respective pipes and the supervision of the connection process; if the respective point of connection crosses any right-of-way of the village and/or third-party property line said connection shall be in the amount of $1,500.
(3) Connection to the village’s water transmission system and sanitary sewer system shall be permitted from April 1 thru November 15 of the calendar year, access to said systems is otherwise prohibited unless prior written permission is obtained from the village.
(4) Any violation of this section shall be subject to a fine of $750 for each and every day that the violation occurs.
(Prior Code, § 150.024) (Ord. 97-16, passed 3-2-1998; Ord. 14-01, passed 2-11-2014; Ord. 18-02, passed 1-23-2018; Ord. 18-26, passed 12-11-2018; Ord. 21-16, passed 7-27-2021; Ord. 23-08, passed 6-27-2023)